• +6 03 5166 6620
  • +6 019 224 0993
  • contact@eam.com.my

Energy Management Program (EMP)

  1. Energy auditing
  2. Baseline energy envelope agreement
  3. Project development program
    • Performance contract
    • Joint development
    •  Consultation
  1. Performance monitoring
  2. Performance maintenance

How Do We Provide Energy Management Services?

Objective of Audit

  1. To identify opportunity for energy saving of the audited system and recommend for improvement without compromising safety, operation and comfort level.
  2. To obtain actual characteristic and status operation of the system, in aspect of energy consumption.

EMP Advantages

  • Cost reduction to optimum value – EMP identify and rectified the loss item.
  • Savings from improving the mode of operation, O&M cycle and utilise the cost effective method on managing the energy consumed.
  • Owner or plant operator will benefit:
    • Reduction in operating cost.
      • If performance contract… the operating cost is fixed.
      • If own project development… continue improvement within capital budget availability since the improvement items is identified.
    • Reduction in maintenance cost.
      • Plants are operating at their optimum designed criteria i.e. no overheating for motor, reduce excessive heat for lamp and air-condition temperature setting.
      • Fixed maintenance cost for performance contract except changing the asset at their due for retirement.

Main EMP Services

  • Energy Audit
  • Energy saving product supplier
  • Performance Monitoring
  • Joint Development Contract

Our Energy Saving Products

  • LED Lighting
  • Lighting Control Saving Unit
  • Motor Starters and VSD
  • Motor Control Saving Unit
  • Aircond Chiller Management System
  • Aircond Hydrocarban Refrigerant Application
  • Aircond indoor control unit
  • Aircond outdoor Control unit
  • Power Conditioner – Force
  • Power factor control
  • Power Harmonic Controller

Our Energy Audit Past Projects

  • EACG at Mesra Mall, Kerteh under SEDA
  • EACG at Kaneka (M) Sdn Bhd, Gebeng under MGTC
  • Puncak Niaga Water Treatment Plant Sg. Langat
  • Toyota Auto Body (M) Sdn Bhd, Shah Alam
  • USM Pulau Pinang & USM Kubang Kerian
  • Reltech Ventures Sdn Bhd for Prasarana Berhad
  • Leader Cable Industry Berhad, Sg Petani
  • IGA at Politeknik Seberang Perai under MGTC
  • ACMV Audit at TNB Pahang for TNBES
  • Wasco Coatings (M) Sdn. Bhd, Gebeng
  • Mastra Industries, Port Klang
  • Menara Celcom Sect. 14, Petaling Jaya for Celcom Axiata
  • Langkawi Sheraton Hotel